Quick Access to MassDOT main site.

MassDOT Blog

The Official Blog of the Massachusetts Department of Transportation

Monthly Archives: August 2016

MBTA: Year-Round Student Pass Program About to Begin Posted on Aug 30

MBTA: Year-Round Student Pass Program About to Begin

Under an expansion of the Student Pass program approved by the MBTA’s Fiscal and Management Control Board, effective September 1, students with a Student CharlieCard will pay half-price per trip on all modes of transit and may obtain a monthly bus and subway pass for   …Continue Reading MBTA: Year-Round Student Pass Program About to Begin

MBTA Hires Chan to Oversee Real Estate Assets Posted on Aug 30

MBTA Hires Chan to Oversee Real Estate Assets

The MBTA has hired Janelle Chan as the Authority’s new real estate manager.  Chan, who holds advanced degrees from both Harvard University and the Massachusetts Institute of Technology (MIT), will oversee management of the T’s real estate interests. In line with Governor Charlie Baker’s Open   …Continue Reading MBTA Hires Chan to Oversee Real Estate Assets

MassDOT, MAPFRE: Highway Assistance Patrol Posted on Aug 29

MassDOT, MAPFRE: Highway Assistance Patrol

Posted by: Patrick McDonald, CPCU, AIM, AIS, Executive Vice President – Business & Clients, MAPFRE Insurance MAPFRE Insurance sponsors the MassDOT Highway Assistance Patrol (HAP) program and reminds motorists that during Labor Day weekend many Massachusetts drivers will be taking their last vacations of the   …Continue Reading MassDOT, MAPFRE: Highway Assistance Patrol

A First in the State: MassDOT Uses New Construction Technique on Route 2/I-95 Project Posted on Aug 28

A First in the State: MassDOT Uses New Construction Technique on Route 2/I-95 Project

From smaller projects to the largest, MassDOT uses the latest, proven innovative techniques. For the first time in the state, MassDOT is using precast, modular concrete abutments on the Route 2/I-95 Bridge Replacement Project. Accelerated Bridge Construction technologies, such as this one, reduce project duration   …Continue Reading A First in the State: MassDOT Uses New Construction Technique on Route 2/I-95 Project

Route 107 Corridor Public Meetings Scheduled Posted on Aug 26

Route 107 Corridor Public Meetings Scheduled

Public Information Meetings for the Route 107 Corridor Study have been scheduled as follows: Wednesday, September 7, 6:00 PM to 8:00 PM, Lynn English High School, Auditorium, 50 Goodridge Street Tuesday, September 13, 6:00 PM to 8:00 PM, Collins Middle School, Auditorium, 29 Highland Avenue,   …Continue Reading Route 107 Corridor Public Meetings Scheduled

Gill-Montague Bridge Rehabilitation Celebrated Posted on Aug 25

Gill-Montague Bridge Rehabilitation Celebrated

MassDOT Secretary and CEO Stephanie Pollack and Highway Administrator Thomas J. Tinlin joined Director of Governor Charlie Baker’s Western Massachusetts Office Michael Knapik, Senate President Stanley C. Rosenberg, state and local officials today in Turners Falls to celebrate the complete rehabilitation of the Avenue A   …Continue Reading Gill-Montague Bridge Rehabilitation Celebrated

All Electronic Tolling Coming: How to Sign Up for EZPass Posted on Aug 24

All Electronic Tolling Coming: How to Sign Up for EZPass

In late October, MassDOT is scheduled to activate All Electronic Tolling on I-90 and the Boston tunnels. All Electronic Tolling has been in place for vehicles since July 2014 on the Tobin Bridge. To ensure drivers pay the lowest possible toll rate inside Massachusetts, drivers   …Continue Reading All Electronic Tolling Coming: How to Sign Up for EZPass

All Electronic Tolling Fare Structure Public Meetings Set Posted on Aug 23

All Electronic Tolling Fare Structure Public Meetings Set

The Massachusetts Department of Transportation is convening public hearings on toll structure changes within I-90, (the Massachusetts Turnpike), and the Metropolitan Highway System, which includes the Boston tunnels and the Tobin Memorial Bridge. The proposed changes include changes in the toll structure and rates through   …Continue Reading All Electronic Tolling Fare Structure Public Meetings Set

South Coast Rail Public Meetings Set Posted on Aug 23

South Coast Rail Public Meetings Set

MassDOT and the MBTA will host a series of public meetings beginning next month on the proposed restoration of passenger rail service between the South Coast and Boston. Designers are considering a new connection making use of the existing MBTA Stoughton Commuter Rail Line. The   …Continue Reading South Coast Rail Public Meetings Set

MassDOT Moves Forward on All Electronic Tolling Posted on Aug 22

MassDOT Moves Forward on All Electronic Tolling

The Massachusetts Department of Transportation (MassDOT) Board of Directors acted today to move ahead with plans to completely demolish Interstate 90 toll plazas by the end of 2017 as a milestone in the state’s progress toward All Electronic Tolling (AET) along Interstate 90 (the Massachusetts   …Continue Reading MassDOT Moves Forward on All Electronic Tolling