Post Content

Craigie Drawbridge MassDOT has scheduled three public meetings in Boston to discuss the construction plans and anticipated traffic impacts for the rehabilitation of the Craigie Drawbridge, which carries McGrath O’Brien Highway (Route 28) between Land Blvd. in Cambridge and Leverett Circle in Boston.  Following a presentation, MassDOT staff will lead a discussion to answer questions. Meetings times and locations are as follows:

Beacon Hill/West End, October 25,  6:30 PM,  74 Joy Street,  Boston
Charlestown, October 27, 7:00 PM, Charlestown Police Station, 55 Bunker Hill Street
North End, October 28, 6:00 PM, Nazzaro Community Center, 30 North Bennet Street, Boston 

Effective November 6, MassDOT will close all inbound travel lanes on Route 28 southbound at the intersection of Land Boulevard as part of the Craigie Drawbridge Rehabilitation Project Phase I. The Craigie Drawbridge carries McGrath O’Brien Highway (Route 28) between Land Blvd. in Cambridge and Leverett Circle in Boston.

Traffic trying to access I-93 and Storrow Drive will be detoured east over the Gilmore (Prison Point) Bridge towards Bunker Hill Community College/City Square. Traffic heading to I-93 Northbound will be directed left through Sullivan Square, while traffic trying to access I-93 Southbound and Route 1 via the Tobin Bridge will be directed to turn right. Traffic traveling to the Charles Circle Area will be detoured westbound down Land Boulevard to the Longfellow Bridge to cross the Charles River. Outbound traffic leaving Boston through Leverett Circle will be unaffected during this period.

For more information on the Craigie Drawbridge Rehabilitation project, visit MassDOT's Charles River Bridges website: www.mass.gov/massdot/charlesriverbridges.

Access to the Museum of Science will not be restricted but patrons are advised to approach the Museum from Boston to avoid anticipated traffic congestion on the Cambridge side of the project.

Full bike and pedestrian access in each direction will be maintained during construction.  During Phase I of the drawbridge replacement, only one side of the bridge will be opened and must be shared by inbound and outbound bicycle and pedestrian traffic.  A manned and signalized crossing area will be placed at the mid-point of the roadway at the Museum of Science during these phases. 

As a result of the construction activities, the Charles River Channel will be closed to all marine traffic beginning at 12 AM on November 1, 2010 and will reopen no later than April 27, 2011.

MassDOT encourages auto commuters to consider taking advantage of alternative transportation opportunities to avoid traffic and increased commuting times. For additional information on alternative commuter options please see www.mbta.com or contact the MBTA Customer Support Services Center at (617) 222-3200 or TTY (617) 222-5146. Customer Service representatives are available Monday-Friday 6:30 AM – 8:00 PM and Saturday-Sunday from 7:30 AM – 6:00 PM.

Written By:

Recent Posts

MBTA: Blue Hill Avenue Station Project Public Meeting Set posted on Sep 22

MBTA: Blue Hill Avenue Station Project Public Meeting Set

The MBTA on Wednesday, October 5, will present design details, project benefits, bid date/process, construction phasing and construction schedule of its Blue Hill Avenue Station project. A public meeting has been scheduled as follows: Wednesday, October 5, 6:00 PM, Mattapan Branch Library, 1350 Blue Hill   …Continue Reading MBTA: Blue Hill Avenue Station Project Public Meeting Set

Arsenal Street Corridor Study Public Meeting Set posted on Sep 22

Arsenal Street Corridor Study Public Meeting Set

Please join the Massachusetts Department of Transportation for a Public Information Meeting on the Arsenal Street Corridor Study as follows: Tuesday, October 4, 6:00 PM to 8:00 PM, Watertown Middle School, Auditorium & Cafeteria, 68 Waverly Avenue, Watertown MassDOT is studying the Arsenal Street Corridor in   …Continue Reading Arsenal Street Corridor Study Public Meeting Set

Baker-Polito Administration Announces Complete Streets Program Grants posted on Sep 21

Baker-Polito Administration Announces Complete Streets Program Grants

Lieutenant Governor Karyn Polito, Transportation Secretary and CEO Stephanie Pollack, Highway Administrator Thomas Tinlin, and members of the Legislature today announced grant funding from the Complete Streets Program to 11 participating municipalities.  A ceremony was held at the Massachusetts State House to distribute funding for   …Continue Reading Baker-Polito Administration Announces Complete Streets Program Grants