Post Content

EZPass Sign Up, Lynn, June 24, 2014MassDOT E-ZPass outreach efforts are adding new customers at an unprecedented pace. More than 39,000 new E-ZPass transponders have been issued since All-Electronic Tolling began on the Tobin Bridge on July 21!

Tolls on the Tobin are collected electronically through the E-ZPass transponder or via a “pay-by-plate” system, where an image of a license plate is taken and an invoice will be sent to the address listed on the vehicle registration.

The E-ZPass Team is visiting communities listed below in the next several days. Please stop by. You may also join E-ZPass online, Mass.gov/EZPassMA or by phone, 877-627-7745. Transponders are also available at Registry of Motor Vehicles branches and from AAA.

Wednesday, August 13, 11:30am-4:30pm, Beverly Super Stop & Shop, 224 Elliot St.
Thursday, August 14, 11am-5pm, Prince Pizzeria, 517 Broadway Rt. 1 South, Saugus
Friday, August 15, 11am-5pm, Kowloons, 948 Broadway Rt. 1 North, Saugus
Saturday, August 16, 11am-5pm, Kowloons, 948 Broadway Rt. 1 North, Saugus
Monday, August 18, 11am -5pm, Stop & Shop, 40 Furlong Dr, Revere
Wednesday, August 20, 11am-5pm, Department of Education, 75 Pleasant Street, Malden
Friday, August 22, 11am-5pm, Stop & Shop, 40 Furlong Dr, Revere
Saturday, August 23, 10am-2pm Kowloons, 948 Broadway Rt. 1 North, Saugus

Written By:

Recent Posts

Longfellow Bridge: Next Stage of Construction to Begin in August posted on Jul 22

Longfellow Bridge: Next Stage of Construction to Begin in August

MassDOT’s contractor is scheduled to begin the next stage of construction on the Longfellow Bridge in August 2016 now that the MBTA Red Line trains have been moved to their new locations. In this stage, bridge rehabilitation work will occur under the MBTA outbound track.   …Continue Reading Longfellow Bridge: Next Stage of Construction to Begin in August

Maynard: Assabet River Rail Trail to Connect with MBTA Station posted on Jul 21

Maynard: Assabet River Rail Trail to Connect with MBTA Station

MassDOT Highway Administrator Tom Tinlin today joined local legislators to break ground on the Assabet River Rail Trail construction project in Maynard. The $6.7 million project links the Assabet River National Wildlife Refuge with the downtown Maynard business district as well as the MBTA South   …Continue Reading Maynard: Assabet River Rail Trail to Connect with MBTA Station

Coming Soon: Electric Vehicle Fast Charging Stations posted on Jul 20

Coming Soon: Electric Vehicle Fast Charging Stations

MassDOT has announced that “Fast Charging” Stations for Electric Vehicles will be available at I-90 Service Plazas beginning later this year. Depending upon the electric vehicle and the state of its current charge, the stations will charge an electric vehicle to at least 80% power   …Continue Reading Coming Soon: Electric Vehicle Fast Charging Stations