Post Content

Route 2 I-95 Project March 2016 4In another major project milestone for the Route 2 I-95 Bridges Project in Lexington, MassDOT will shift Route 2 westbound traffic to the new Route 2 West bridge for the final phase of construction. The shift will take place in phases over the weekend beginning at 8:00 PM on Friday, May 13, and ending at 5:00 AM on Monday, May 16.

Ramps will be reopened in phases during this timeframe. The westbound traffic shift will allow the contractor to demolish the old Route 2 West bridge.

Exit Closures

The shift will require the following temporary exit closures:

  • Exit 52A from Route 2 West to I-95 South
  • Exit 52B from Route 2 West to I-95 North
  • Exit 29B from I-95 South to Route 2 West
  • Exit 29B from I-95 North to Route 2 West

The exit ramp closures are necessary so the contractor can modify them to align with the new roadway. During the closures, drivers should use the signed detour routes described below. Detour maps are also available on the project website. 

Detour Routes & Maps 

  • Route 2 West to I-95 SouthFollow Route 2 West past I-95 to just past Bedford Road and use the existing exit (signs for Bedford Road/Lincoln) to reverse direction. At the traffic signal, turn left onto Route 2 East and then take Exit 52A onto I-95 South. 
  • Route 2 West to I-95 NorthFollow Route 2 West past I-95 and turn right onto Bedford Road. From Bedford Road, turn right onto Route 2A East, cross over I-95, and then immediately turn right onto the on-ramp to I-95 North.
    • Detour for Route 2 West to I-95 North (when Exit 52A is reopened) – From Route 2 West, take Exit 52A for I-95 South, immediately take Exit 29A for Route 2 East, and then immediately take Exit 52B onto I-95 North. 
  • I-95 North to Route 2 West – From I-95 North, take Exit 29A for Route 2 East. Take Exit 53 for Spring Street, turn right onto Spring Street, and cross over Route 2. Turn right onto Hayden Avenue and then turn right onto the on-ramp to Route 2 West.
  • I-95 South to Route 2 WestFrom I-95 South, take Exit 30B for Route 2A West. Follow Route 2A West until it merges with Route 2 West at Crosby’s Corner in Concord.
    • Alternate Detour for I-95 South to Route 2 WestFrom I-95 South, take Exit 29A for Route 2 East. Take Exit 53 for Spring Street, turn right onto Spring Street, and cross over Route 2. Turn right onto Hayden Avenue and then turn right onto the on-ramp to Route 2 West.

For questions, please contact Donny Dailey, 617-945-4272, Donny.Dailey@state.ma.us, or the project field office, 781-790-5261. For more information, visit the project website.

Written By:

Tags:

Recent Posts

July Fourth Holiday Weekend posted on Jul 2

July Fourth Holiday Weekend

BOSTON – The Massachusetts Department of Transportation (MassDOT) is advising the public for this Fourth of July to consider staying a home due to the pandemic, but if making travel arrangements, to check destinations for the health protocols which are in place and, if driving, plan for trips   …Continue Reading July Fourth Holiday Weekend

RMV New Online: Vehicles may be Registered without a visit to the RMV posted on Jun 29

RMV New Online: Vehicles may be Registered without a visit to the RMV

The Massachusetts Registry of Motors Vehicles (RMV) is announcing that in partnership with Boston Software Corporation, a new online service is now available which enables independent insurance agents to renew and reinstate passenger and commercial vehicle registrations on behalf of their customers.  This eliminates the   …Continue Reading RMV New Online: Vehicles may be Registered without a visit to the RMV

MassDOT Registry of Motor Vehicles Program Initiatives Receive AAMVA Awards posted on Jun 26

MassDOT Registry of Motor Vehicles Program Initiatives Receive AAMVA Awards

The Massachusetts Registry of Motor Vehicles (RMV) is announcing that it has been selected to receive awards from the American Association of Motor Vehicle Administrators (AAMVA) for its efforts in implementing new fraud and prevention initiatives, developing an Alternate Residency Affidavit Program, and creating four   …Continue Reading MassDOT Registry of Motor Vehicles Program Initiatives Receive AAMVA Awards