Post Content

Littleton Yellow Signal Installation Intersection 2014

Littleton

MassDOT today announced it will activate new traffic signal technology that has been proven to increase safety at intersections.

The signal technology is being activated at the intersection of Great Road and King Street in Littleton, left. The signal heads have four left-turn arrows: one steady red arrow, indicating that left turns are prohibited; one steady yellow arrow, indicating the signal is changing from green to red; a new, flashing yellow arrow, indicating that drivers can proceed with left turns after yielding to oncoming vehicles; and one steady green arrow, indicating left turns are permitted.

“The flashing yellow arrow is a better indicator to drivers that they must yield the right of way to oncoming traffic. Drivers with the flashing yellow arrow can still turn left, but only when it is safe to do so,” said MassDOT Acting Secretary Frank DePaola. “Through the use of this new technology, we’re confident the turning movements will be clearer to drivers, and the intersection will be safer as a result.”

In addition to the new signal technology, intersection improvements include reconfiguration of the travel lanes on King Street to provide a dedicated left-turn lane in both directions on to Great Road.

 

Lenox: Flashing Yellow

Lenox: Flashing Yellow

This is the second installation of Flashing Yellow technology.  In January 2013, MassDOT installed Flashing Yellow Arrow signal heads at the intersection of Holmes Road and Pittsfield Road in Lenox. Since this first of its kind installation, the high-crash intersection has only seen one left-turn crash.

Based on the success of its use in Lenox, MassDOT determined that its use in Littleton will achieve a similar result in improving safety at Great Road and King Street.

The Littleton intersection will precede a statewide effort to retrofit some 350 signal heads around the Commonwealth, which will begin next year.

More information on Flashing Yellow Arrow is available at: http://www.massdot.state.ma.us/highway/Departments/TrafficandSafetyEngineering/TrafficSignals/FlashingYellowArrow.aspx.

Written By:

Recent Posts

Fall River: Route 79 Braga Bridge Project Completion Overview posted on Jan 17

Fall River: Route 79 Braga Bridge Project Completion Overview

MassDOT invites you to review the final fact sheet for the Fall River Route 79 Braga Bridge Improvements Project. The work reached substantial completion in fall 2016 with the reopening of all lanes on the Braga Bridge. This landmark project offered significant long term enhancements:   …Continue Reading Fall River: Route 79 Braga Bridge Project Completion Overview

Boston: Route 203 Project Public Meeting Set posted on Jan 13

Boston: Route 203 Project Public Meeting Set

MassDOT has scheduled a Public Information Meeting to discuss the proposed Route 203 Improvements Project from West Selden Street to Gallivan Boulevard in Boston as follows: Thursday, January 19, 6:00 PM, Mildred Avenue Middle School, Auditorium, 5 Mildred Avenue, Mattapan The purpose of this public   …Continue Reading Boston: Route 203 Project Public Meeting Set

Freight Plan Public Open House Set posted on Jan 10

Freight Plan Public Open House Set

MassDOT’s Freight Plan is a strategic planning document that will define a short and long-term vision for the freight system in Massachusetts and identify solutions to current and future challenges to the freight system. The first Open House for the Massachusetts Freight Plan has been   …Continue Reading Freight Plan Public Open House Set