Post Content

Route 2 Irene Damage 1 MassDOT has assembled a map showing the closed portion of Route 2 that suffered significant damage due to flooding from Tropical Storm Irene and outlining the current posted detour.

Route 2 is closed from Mile Marker 21.6 in Florida to Mile Marker 27.5 in Charlemont, with damage including severe slope failures, roadway undermining and instability, eroded bridge approaches, mud slides, and culvert and retaining wall damage.

The significant damage and necessary repairs require an extended period of time to restore the roadway, and MassDOT is committed to an accelerated repair process. 

Please review the Route 2 damage and detour route map to learn more and view photos of the damage.

The Detour Route is also listed below.

From North Adams: 

Route 8, Adams, to Route 116 through Adams, Savoy, Plainfield, and Ashfield,

to Route 112 through Ashfield and Buckland,

to Route 2, East Charlemont.

Written By:

Recent Posts

Join us! 2016 Northeast Transportation Safety Conference June 7-8 posted on May 6

Join us! 2016 Northeast Transportation Safety Conference June 7-8

MassDOT is pleased to be a host for the 2016 Northeast Transportation Safety Conference on June 7-8 at the DCU Center in Worcester. State and local transportation safety and public safety representatives and members of the public are invited to join hundreds of individuals involved   …Continue Reading Join us! 2016 Northeast Transportation Safety Conference June 7-8

Students Celebrate Walk and Bike to School Day posted on May 4

Students Celebrate Walk and Bike to School Day

Thousands of elementary and middle school students all over the Commonwealth walked and rode their bikes to school in celebration of the 7th Annual Massachusetts Walk and Bike to School Day. Nearly 300 schools participated in the event. “It’s encouraging to see so many communities   …Continue Reading Students Celebrate Walk and Bike to School Day

Natick: MassDOT Breaks Ground on Marion Street Bridge posted on May 4

Natick: MassDOT Breaks Ground on Marion Street Bridge

MassDOT today broke ground on a new bridge that will carry Marion Street over railroad tracks in Natick. The new bridge will feature a single superstructure with steel beams, concrete deck with asphalt surface on existing abutments, and a 6-foot wide sidewalk. Pedestrian access will   …Continue Reading Natick: MassDOT Breaks Ground on Marion Street Bridge