Post Content

Pothole Repair, Route 24, Canton-Randolph 3, March 12, 2013Potholes are the inevitable result of winter and early spring moisture and the freeze-thaw cycle.  MassDOT crews throughout the Commonwealth are prepared each day to repair potholes that can damage vehicles and delay traffic.

We also appreciate the public’s help in telling us about pothole locations on state roads so that repairs can be made as quickly as possible.

Potholes result as water from snow and rain seeps into small cracks in the roadway surface.  As temperatures drop, the water freezes and expands, making the cracks larger until potholes form. Heavy traffic, pavement age, vehicle weights, and snow and ice operations contribute to the problem.

Crews make two types of repairs, depending on temperature and road conditions.  A temporary “cold patch” is used at lower temperatures during late winter.  Hot mix asphalt is applied at higher temperatures as a long-term fix.

MassDOT works closely with public safety officers and city and town officials to monitor potholes.  We also appreciate reports from drivers.

If you see a pothole, please call MassDOT at 857-DOT-INFO (857-368-4636), Toll Free at 877-MA-DOT-GOV (877-623-6846), or visit our online contact information web page to send us an e-mail.

Written By:

Recent Posts

MassDOT, MAPFRE Insurance Reminder: Avoid “Blackout Wednesday” and Buckle Up This Thanksgiving posted on Nov 12

MassDOT, MAPFRE Insurance Reminder: Avoid “Blackout Wednesday” and Buckle Up This Thanksgiving

The two most traveled holidays are upon us, with the first being Thanksgiving weekend. From Wednesday, November 27th through Monday, December 2nd, all drivers should be aware of the factors that make this holiday one of the deadliest for our roadways. According to the National   …Continue Reading MassDOT, MAPFRE Insurance Reminder: Avoid “Blackout Wednesday” and Buckle Up This Thanksgiving

I-90 Allston Multimodal Project: Document Online, Public Comments Encouraged posted on Nov 6

I-90 Allston Multimodal Project: Document Online, Public Comments Encouraged

MassDOT is inviting the public to an informational meeting on Thursday, November 7, between 6:30 p.m. and 8:30 p.m. which is being hosted by the Federal Highway Administration (FHWA) to introduce the National Environmental Policy Act (NEPA) Scoping Document for MassDOT’s I-90 Allston Multimodal Project.    …Continue Reading I-90 Allston Multimodal Project: Document Online, Public Comments Encouraged

Worcester: Kelley Square Public Meeting November 20th posted on Nov 6

Worcester: Kelley Square Public Meeting November 20th

A Public Information Meeting for the Worcester Kelley Square Improvement Project has been scheduled as follows: Wednesday, November 20, 6PM, Crompton Collective White Room, 138 Green Street. MassDOT and its general contractor for the project, J.H. Lynch, will discuss the project’s overall construction phasing, key   …Continue Reading Worcester: Kelley Square Public Meeting November 20th