Post Content

MBTA Assembly Square Opens, Governor Patrick, September 2, 2014Governor Deval Patrick today joined state and local officials and Somerville business owners at the opening ceremony of the new Assembly Orange Line MBTA station. Assembly is the first new MBTA station in 27 years and is a key element in the creation of a transit-oriented development at Assembly Row, providing a vital transit link between Assembly Row and Boston.

“We invest in infrastructure to catalyze private development, revitalize urban neighborhoods and bolster growth and opportunity across the Commonwealth,” said Governor Patrick. “The new Assembly Orange Line station is a concrete reminder of what can be achieved through public-private partnership and investment in our communities.”

Assembly is the first new MBTA subway station to be opened since the southern portion of the Orange Line was moved from the Washington Street Elevated Line to the Southwest Corridor in 1987 (Tufts, Back Bay, Massachusetts Avenue, Ruggles, Roxbury Crossing, Jackson Square, Stony Brook, Green Street and Forest Hills all opened on May 4, 1987). The Assembly station design includes a glass two-story entrance building at the corner of Foley and G Streets, with stairs, escalators and elevators leading to a glazed glass bridge crossing G Street and the inbound track. The bridge connects to another glass 2-story building between the inbound and outbound tracks, where transit riders will pass through the fare array and travel down to platform level on another stair, escalator or elevators. The new station has integrated intuitive design and is fully accessible and compliant with the Americans with Disabilities Act (ADA). The daily projected ridership at the Assembly station is expected to be between 4,800 and 5,400 passengers by 2030.

“A demand for enhanced access to transit, for smart development centered on transportation access and for livable, workable communities has been heard loud and clear by this Administration,” said MassDOT Secretary & CEO Richard A. Davey. “The opening of the new Assembly station today is a direct response to that demand that will provide easy, affordable access to rapid transit in this new neighborhood of Somerville.”

“The first new MBTA station in 27 years is a testament to the key role that access to transportation plays in the growth and redevelopment of our cities and towns,” said MBTA General Manager Dr. Beverly Scott. “Assembly is a modern, fully accessible, environmentally-friendly Orange Line station that will serve this blossoming new neighborhood and the City of Somerville well for years to come.”

The station’s design also includes sustainable and environmentally-friendly elements such as extensive daylighting, storm water retention, and energy-conserving electrical power controls and lighting fixtures. The station features passive solar power design; which allows the building windows, walls, and floors to collect, store, and distribute solar energy in the form of heat in the winter and reject solar heat in the summer, without using electricity.
The development will include more than 2.8 million square feet of office space, 635,000 square feet of retail, restaurant and entertainment uses, and 1,813 homes. It will feature public benefits like a waterfront park, open space, and new bike and pedestrian paths connecting existing neighborhoods with the new development.

The new Assembly station is a true public-private partnership, funded through a combination of federal, state and private investment. The total cost of the station is $56 million with $25 million through a MassWorks grant, $16 million in federal funds and a $15 million investment from Federal Realty Investment Trust, the developers of the Assembly Row project.

Written By:

Recent Posts

Route 107 Corridor Public Meetings Scheduled posted on Aug 26

Route 107 Corridor Public Meetings Scheduled

Public Information Meetings for the Route 107 Corridor Study have been scheduled as follows: Wednesday, September 7, 6:00 PM to 8:00 PM, Lynn English High School, Auditorium, 50 Goodridge Street Tuesday, September 13, 6:00 PM to 8:00 PM, Collins Middle School, Auditorium, 29 Highland Avenue,   …Continue Reading Route 107 Corridor Public Meetings Scheduled

Gill-Montague Bridge Rehabilitation Celebrated posted on Aug 25

Gill-Montague Bridge Rehabilitation Celebrated

MassDOT Secretary and CEO Stephanie Pollack and Highway Administrator Thomas J. Tinlin joined Director of Governor Charlie Baker’s Western Massachusetts Office Michael Knapik, Senate President Stanley C. Rosenberg, state and local officials today in Turners Falls to celebrate the complete rehabilitation of the Avenue A   …Continue Reading Gill-Montague Bridge Rehabilitation Celebrated

All Electronic Tolling Coming: How to Sign Up for EZPass posted on Aug 24

All Electronic Tolling Coming: How to Sign Up for EZPass

In late October, MassDOT is scheduled to activate All Electronic Tolling on I-90 and the Boston tunnels. All Electronic Tolling has been in place for vehicles since July 2014 on the Tobin Bridge. To ensure drivers pay the lowest possible toll rate inside Massachusetts, drivers   …Continue Reading All Electronic Tolling Coming: How to Sign Up for EZPass