Post Content

MBTA James Folk

Posted by Jim Folk, MBTA Director of Operations and Planning

There is positive news to report again this year about the safety record of MBTA bus drivers.  The safety record improved again in 2009, as it had in 2008, with the total number of accidents declining in both years.  By the most meaningful statistic, (the number of preventable accidents per number of miles traveled), the MBTA averaged 1.3 accidents for every one hundred thousand miles in 2009 – a drop of more than 25% compared to 1.8 in 2007. 


 An accident is called “preventable” if it could have been averted by actions by the bus driver; in the vast majority (83%) of accidents last year involving MBTA buses the bus driver was not at fault and could not have prevented the accident.  In other words, a car driver is four times more likely to make an error leading to an accident with a bus than a bus driver is likely to make an error leading to an accident with a car.  The MBTA’s accident rate is the equivalent of a car driver going an average of six years between accidents – while managing 40-to-60-foot-long vehicles, constantly pulling into and out of stops, operating on congested streets, and taking care of customers inside the bus. 

The MBTA performs routine safety audits of routes and stops to find and address potential safety hazards, and rides buses to covertly observe operators that have been reported as operating in a manner not consistent with MBTA safety rules and regulations.  The MBTA is always looking for ways to improve safety.  Some steps taken recently include a new operator recertification program, a new “bus simulator” simulated driving environment to improve training, and a zero-tolerance policy on possession of cell phones and electronic devices.   Learn more about MBTA's commitment to safety.

Page0001

Written By:

Recent Posts

Longfellow Bridge: Next Stage of Construction to Begin in August posted on Jul 22

Longfellow Bridge: Next Stage of Construction to Begin in August

MassDOT’s contractor is scheduled to begin the next stage of construction on the Longfellow Bridge in August 2016 now that the MBTA Red Line trains have been moved to their new locations. In this stage, bridge rehabilitation work will occur under the MBTA outbound track.   …Continue Reading Longfellow Bridge: Next Stage of Construction to Begin in August

Maynard: Assabet River Rail Trail to Connect with MBTA Station posted on Jul 21

Maynard: Assabet River Rail Trail to Connect with MBTA Station

MassDOT Highway Administrator Tom Tinlin today joined local legislators to break ground on the Assabet River Rail Trail construction project in Maynard. The $6.7 million project links the Assabet River National Wildlife Refuge with the downtown Maynard business district as well as the MBTA South   …Continue Reading Maynard: Assabet River Rail Trail to Connect with MBTA Station

Coming Soon: Electric Vehicle Fast Charging Stations posted on Jul 20

Coming Soon: Electric Vehicle Fast Charging Stations

MassDOT has announced that “Fast Charging” Stations for Electric Vehicles will be available at I-90 Service Plazas beginning later this year. Depending upon the electric vehicle and the state of its current charge, the stations will charge an electric vehicle to at least 80% power   …Continue Reading Coming Soon: Electric Vehicle Fast Charging Stations