wood-memorial-bridge-mbta-january-24-2017MassDOT announced that due to construction operations for the Woods Memorial Bridge Project, on Saturday, January 28, and Sunday, January 29, MBTA shuttle buses will replace subway and commuter rail services at the locations listed below:

  • Orange Line – Shuttle buses will replace trains from Wellington Station to Oak Grove Station.
  •  Commuter Rail – The Haverhill Line will terminate/originate at Malden Center. Shuttle buses will be provided between Oak Grove Station, Malden Center, and Wellington Station.

Regular MBTA service will resume at the start of service on Monday, January 30, 2017.

Rivers Edge Drive, which travels under Route 16, will be closed to vehicular and pedestrian traffic with Wellington Circle and Santilli Circle as the alternate route to reverse direction.

Appropriate signs, channelizing devices and traffic control measures will be used to guide drivers through the restricted area.

MassDOT encourages drivers to seek alternate routes, if possible, to avoid delays.  Drivers that must travel through the affected area should expect delays, reduce speed and use caution while traveling through the work zone.

Written By:

Tags:

Recent Posts

Tobin Bridge/Chelsea Curves Rehabilitation Project Update posted on Aug 15

Tobin Bridge/Chelsea Curves Rehabilitation Project Update

MassDOT has announced that the lane closures and roadway configuration on Route 1 northbound in Chelsea will shift on Monday, August 19 so that the center lane on this section of highway will be closed 24/7. Both the right and left travel lanes will be   …Continue Reading Tobin Bridge/Chelsea Curves Rehabilitation Project Update

First New MBTA Orange Line Cars Enter Passenger Service posted on Aug 14

First New MBTA Orange Line Cars Enter Passenger Service

Governor Charlie Baker, MassDOT Secretary and CEO Stephanie Pollack, and MBTA General Manager Steve Poftak today introduced the first new Orange Line train comprised of six brand new cars into regular service from Wellington Station. These six new cars entering passenger service today are the   …Continue Reading First New MBTA Orange Line Cars Enter Passenger Service

MBTA Announces Accelerated Schedule for System Upgrades, Cuts Project Timelines posted on Aug 12

MBTA Announces Accelerated Schedule for System Upgrades, Cuts Project Timelines

The MBTA today announced several planned system upgrade construction projects will be accelerated, shortening some timelines by as much as eleven months for certain projects. System upgrade work to improve reliability for riders on the Green, Red, and Orange Lines that was previously scheduled to   …Continue Reading MBTA Announces Accelerated Schedule for System Upgrades, Cuts Project Timelines