Post Content

Transportation Secretary Jeff Mullan today is there and records video as the MBTA begins clearing the Mattapan High Speed Line with a jet blower following the December 26-27 winter storm. The jet blower shortens the process of clearing and leaves traditional equipment available for other snow clearing duties.  A noisy but highly effective strategy. 

 

Written By:

Recent Posts

Grafton, Millbury: I-90 Resurfacing Project Moves Forward posted on Apr 25

Grafton, Millbury: I-90 Resurfacing Project Moves Forward

MassDOT is continuing to move forward with a $13.6 million project to resurface and repair an 8-mile section of I-90 (the Massachusetts Turnpike) on both the eastbound and westbound sides in Millbury and Grafton. This project will have work completed in two phases: during the   …Continue Reading Grafton, Millbury: I-90 Resurfacing Project Moves Forward

MBTA: Strategic Plan Adopted posted on Apr 24

MBTA: Strategic Plan Adopted

The MBTA’s Fiscal and Management Control Board (FMCB) today approved an MBTA Strategic Plan, a document that fulfills the FMCB requirement in its enabling legislation that required development of such a plan. This plan serves as a blueprint for institutionalizing the objectives and strategies needed   …Continue Reading MBTA: Strategic Plan Adopted

Sumner Tunnel Toll Demolition Moving Forward posted on Apr 24

Sumner Tunnel Toll Demolition Moving Forward

MassDOT is moving forward with toll demolition and road reconstruction operations at the existing toll plaza at the entrance to the Sumner Tunnel in East Boston. Work-related logistical activities at the Sumner Tunnel began last week including marking utilities and installing temporary signage and the   …Continue Reading Sumner Tunnel Toll Demolition Moving Forward