Post Content

Fill a Bus 2013MassDOT and the MBTA are holding the 13th annual “Fill-A-Bus” new toy donation program next week, December 9 – 13.

Please donate a new, unwrapped toy when the Fill-A-Bus visits your community!

The Fill-A-Bus program benefits MSPCC – Mass Society for the Prevention of Cruelty to Children and The Commonwealth Tenants Association.

The gift wish list includes:

Blocks, Legos • Dolls • Sporting Equipment • Books
Board Games • Xbox or Playstation Games • Bikes
Scooters • Gift Cards (iTunes, Movie, Restaurant, Clothing)
Electronic Music Accessories (headphones)
Remote Control Cars/Trucks • Hats, Gloves, Scarves
Developmental Toys • Art Supplies • Jewelry Kits

You may donate a new, unwrapped toy when the Fill-A-Bus visits the locations listed below.  Thank you for your donation!

THE BUS WILL VISIT THE FOLLOWING LOCATIONS:

Monday, December 9:

Highway District 3 Office, 403 Belmont St., Worcester, 9:00–10:00 a.m.
MBTA Everett Repair Shop, 80 Broadway, Everett, 12:00–1:00 p.m.
MBTA Charlestown Bus Garage, 21 Arlington Ave., Charlestown, 2:00–3:00 p.m.

Tuesday, December 10:

Highway District 4 Office, 519 Appleton St., Arlington, 9:00–10:00 a.m.
MBTA Lynn Bus Garage, 985 Western Ave., Lynn, 11:00 a.m.–12:00 p.m.
MBTA Operations, 45 High St., Boston, 1:00–2:00 p.m.

Wednesday, December 11:

Watertown RMV, 550 Arsenal St., Watertown, 9:00–10:00 a.m.
Quincy Bus Garage, 954 Hancock St., Quincy, 11:00 a.m.–12:00 p.m.
Transit Police–Southampton, 240 Southampton St., Boston, 1:00 – 2:00 p.m.

Mass Aeronautics, 1 Harborside Dr., East Boston, 2:15–3:15 p.m.

Thursday, December 12:

MBTA 500 Arborway, Jamaica Plain, 9:00–10:00 a.m.
Braintree RMV, 10 Plain St., Braintree, 11:00 a.m.–12:00 p.m.
Quincy RMV Headquarters, 25 Newport Ave., Extension, 1:00–2:00 p.m.

Friday, December 13:

Highway District 6 Office, 185 Kneeland St., Boston, 9:00–10:00 a.m.
Boston RMV, 630 Washington St., Boston, 10:15–11:15 a.m.
Transportation Building, 10 Park Plaza, Boston, 11:30 a.m.–1:00 p.m.
MBTA Cabot Bus Garage, 275 Dorchester Ave., Boston, 1:30-3:30 p.m.

Written By:

Recent Posts

Longfellow Bridge: Next Stage of Construction to Begin in August posted on Jul 22

Longfellow Bridge: Next Stage of Construction to Begin in August

MassDOT’s contractor is scheduled to begin the next stage of construction on the Longfellow Bridge in August 2016 now that the MBTA Red Line trains have been moved to their new locations. In this stage, bridge rehabilitation work will occur under the MBTA outbound track.   …Continue Reading Longfellow Bridge: Next Stage of Construction to Begin in August

Maynard: Assabet River Rail Trail to Connect with MBTA Station posted on Jul 21

Maynard: Assabet River Rail Trail to Connect with MBTA Station

MassDOT Highway Administrator Tom Tinlin today joined local legislators to break ground on the Assabet River Rail Trail construction project in Maynard. The $6.7 million project links the Assabet River National Wildlife Refuge with the downtown Maynard business district as well as the MBTA South   …Continue Reading Maynard: Assabet River Rail Trail to Connect with MBTA Station

Coming Soon: Electric Vehicle Fast Charging Stations posted on Jul 20

Coming Soon: Electric Vehicle Fast Charging Stations

MassDOT has announced that “Fast Charging” Stations for Electric Vehicles will be available at I-90 Service Plazas beginning later this year. Depending upon the electric vehicle and the state of its current charge, the stations will charge an electric vehicle to at least 80% power   …Continue Reading Coming Soon: Electric Vehicle Fast Charging Stations