Post Content

Watertown Bike Path Before 2 15JAN10 Governor Deval Patrick today announced construction of a multi-use path and intersection improvements in Watertown will move forward this spring.

The Charles River/Alewife Connector project in Watertown will construct a multi-use path along an abandoned rail corridor, left, from School Street to the Arlington Street intersection at Nichols Avenue, Coolidge Hill Road and Crawford Street, with a spur connecting the new path to Arsenal Street across from the Watertown Mall parking lot.

The $847,000 project will include removal of existing railroad rails and ties followed by construction of a ten-foot wide asphalt path with grass shoulders over a distance of approximately two-thirds of a mile. 

In addition, a $1.4 million project approved in late December will resurface the intersections of Spring and Summer, Mount Auburn and Summer, and Arlington and Nichols at the eastern limit of the new multi-use path, including new traffic sensing devices and more accessible sidewalks with wheelchair ramps.

Written By:

Recent Posts

Methuen Rotary Project: I-93 New Exit 46B Now Open posted on Oct 18

Methuen Rotary Project: I-93 New Exit 46B Now Open

MassDOT today opened the new off-ramp (Exit 46B) from I-93 northbound to Route 110/113 westbound. This significant construction milestone is one aspect of the ongoing Methuen Rotary Reconstruction Project.  The new off-ramp from I-93 northbound is located just north of the new bridge carrying I-93   …Continue Reading Methuen Rotary Project: I-93 New Exit 46B Now Open

Champion Officially Joins MBTA Ferry Fleet posted on Oct 18

Champion Officially Joins MBTA Ferry Fleet

On October 18, the MBTA celebrated the upcoming addition of its brand new catamaran ferry, the Champion, with a boat christening ceremony of the new ferry by MBTA General Manager Luis Manuel Ramírez. Ramírez also met with the new vessel’s crew and MBTA ferry management   …Continue Reading Champion Officially Joins MBTA Ferry Fleet

Fitchburg: MassDOT Celebrates Pedestrian and Bicycle Access Improvements at South Street Elementary School posted on Oct 18

Fitchburg: MassDOT Celebrates Pedestrian and Bicycle Access Improvements at South Street Elementary School

MassDOT through the Massachusetts Safe Routes to School Program, today joined students, parents and local leaders to celebrate the operational completion of pedestrian accessibility and safety improvements at the South Street Elementary School in Fitchburg. The improvements created new infrastructure to support walking and bicycling   …Continue Reading Fitchburg: MassDOT Celebrates Pedestrian and Bicycle Access Improvements at South Street Elementary School