Post Content

The new Great River Bridge over the Westfield River opened Tuesday. 

MassHighway Commissioner Luisa Paiewonsky joined MassHighway District 2 Director Albert Stegemann and local officials at the bridge opening. 

The $60 million bridge project is one of the state's largest to date.  The original bridge is now closed for rehabilitation.  When that is completed, both bridges will serve the Westfield area along Routes 202 and 10.

Read the Springfield Republican story. 

Written By:

Recent Posts

All Electronic Tolling Coming: How to Sign Up for EZPass posted on Aug 24

All Electronic Tolling Coming: How to Sign Up for EZPass

In late October, MassDOT is scheduled to activate All Electronic Tolling on I-90 and the Boston tunnels. All Electronic Tolling has been in place for vehicles since July 2014 on the Tobin Bridge. To ensure drivers pay the lowest possible toll rate inside Massachusetts, drivers   …Continue Reading All Electronic Tolling Coming: How to Sign Up for EZPass

All Electronic Tolling Fare Structure Public Meetings Set posted on Aug 23

All Electronic Tolling Fare Structure Public Meetings Set

The Massachusetts Department of Transportation is convening public hearings on toll structure changes within I-90, (the Massachusetts Turnpike), and the Metropolitan Highway System, which includes the Boston tunnels and the Tobin Memorial Bridge. The proposed changes include changes in the toll collection gantry locations and   …Continue Reading All Electronic Tolling Fare Structure Public Meetings Set

South Coast Rail Public Meetings Set posted on Aug 23

South Coast Rail Public Meetings Set

MassDOT and the MBTA will host a series of public meetings beginning next month on the proposed restoration of passenger rail service between the South Coast and Boston. Designers are considering a new connection making use of the existing MBTA Stoughton Commuter Rail Line. The   …Continue Reading South Coast Rail Public Meetings Set