Post Content

img_8525The Massachusetts Department of Transportation and Federal Highway Administration Invites you to the Public Information Meeting to Introduce The National Environmental Policy Act (NEPA) Scoping Document for the Allston I-90 Multimodal Project:

Thursday, November 7, 6:30 – 8:30 PM, Brighton High School, 25 Warren Street 

The purpose of this public information meeting, conducted by the Federal Highway Administration (FHWA) and participated in by MassDOT as the project proponent, is to provide members of the community with an opportunity to become fully acquainted with the Scoping Report for the I-90 Allston Multimodal Project. The meeting will introduce attendees to the contents of the Draft Environmental Impact Statement (DEIS) Scoping Report, provide an overview of the ongoing federal environmental permitting process for the I-90 Allston project, and outline the process for members of the public to comment on the report document.

The public information meeting will kick off a 30-day comment period. Instructions on how to submit comments to FHWA and MassDOT will be provided at the meeting

This location is accessible to people with disabilities. MassDOT provides reasonable accommodations and/or language assistance free of change upon request (including but not limited to interpreters in American Sign Language and languages other than English, open and closed captioning for videos, assistive listening devices and alternative material formats, such as audio tapes, Braille and large print), as available. For accommodations or language assistance, please contact MassDOT legislative liaison, Donny Dailey by phone (857) 368-8902, or by email at Donny.Dailey2@dot.state.ma.us. Request should be made as soon as possible prior to the meeting, and for more difficult to arrange services including sign-language, CART or language translation or interpretation, request should be made at least ten (10) days before the meeting.

To be added to the project email list, request further information, or to view a copy of the Scoping Report on or after November 7th, please visit the project website.

Written By:

Tags: ,

Recent Posts

Acceler-8 I-90 Bridge Replacement Project: I-90 Eastbound Bridge Replacement over Woodland Road posted on Jul 23

Acceler-8 I-90 Bridge Replacement Project: I-90 Eastbound Bridge Replacement over Woodland Road

The Massachusetts Department of Transportation (MassDOT) is announcing that it will replace the I-90 eastbound bridge over Woodland Road in Southborough from 7:00 p.m. on Friday, July 23 to 5:00 a.m. on Monday, July 26. Eastbound traffic will be shifted through a median crossover to the westbound side of I-90. Travel will be reduced to two lanes in each direction and opposing traffic separated by a barrier.

Update: Medford All lanes of I-93 Southbound and Roosevelt Circle are Open for Travel posted on Jul 23

Update: Medford  All lanes of I-93 Southbound and Roosevelt Circle are Open for Travel

The Massachusetts Department of Transportation (MassDOT) is announcing that all lanes on the Roosevelt Circle eastbound bridge are open to traffic as of 11:10 a.m. Friday, July 23rd. There will be some lane width restrictions in place until permanent repairs can be completed which will take several months. Additionally, all lanes on I-93 southbound reopened for travel as of 4:36 p.m. Thursday night, following the completion of temporary repairs to the Roosevelt Circle Overpass which was damaged by an over height truck on Monday afternoon, July 19. Drivers should expect slowdowns within Roosevelt Circle due to the narrowed lane widths in the area of Route 28, the Fellsway and on and off ramps for I-93.

Massachusetts Registry of Motor Vehicles Announces 2021 Low Plate Lottery posted on Jul 22

Massachusetts Registry of Motor Vehicles Announces 2021 Low Plate Lottery

The Massachusetts Registry of Motor Vehicles (RMV) is announcing that applications for the 2021 Low Number Plate Lottery are now being accepted online at Mass.Gov/RMV using the Online Service Center. Applicants must apply by August 27, 2021, and, if selected for a low number plate, will be notified after the virtual drawing takes place on September 8, 2021.