Post Content

Pothole Repair, Route 24, Canton-Randolph 3, March 12, 2013Today, the Baker-Polito Administration launched the Winter Recovery Assistance Program, a $30 million targeted effort to assist cities and towns with repairs to roads and bridges under municipal jurisdiction.

“Since day one, we promised to partner with our cities and towns to provide them with the support needed to keep local infrastructure in reliable shape,” said Governor Charlie Baker. “After an unprecedented winter of heavy snowfall and frigid temperatures, this additional support will allow municipalities to patch up potholes and address local repairs as needed.”

“This winter’s record-setting snowfall has left our cities and towns with a major maintenance deficit that needs to be addressed immediately,” said Lieutenant Governor Karyn Polito. “This program provides municipalities with additional resources to accelerate those repairs and make our roadways safer for everyone.”

“While we strive to invest in the maintenance of the state’s highway infrastructure, it’s important to remember how vital a role our municipal roads and bridges play in the state’s economy and to our overall transportation network,” said MassDOT Secretary and CEO Stephanie Pollack.

The $30 million has been allocated from the existing fiscal 2015 bond authorization for the Department of Transportation. While the WRAP is a distinct effort separate from the Chapter 90 program, to ensure equity, the funds will be distributed to cities and towns based on the Chapter 90 formula.

The Chapter 90 formula determines the apportionment of funding for municipal roads and bridges based on a weighted average of a city or town’s population, employment, and total mileage of roads. The attached spreadsheet lists how the $30 million are apportioned to each city or town using the formula.

Under the WRAP, cities and towns can seek reimbursement from MassDOT on expenditures related to patching potholes, pavement cracking, surface defects, paving projects; repair or replacement of damaged signs, guardrail, storm drains, and line striping.

“This program is a signal to cities and towns that we recognize the importance of these roads and bridges, and the urgency with which they need to be repaired,” said MassDOT Highway Administrator Thomas J. Tinlin.

In order to accelerate local repairs, the WRAP requires all work on municipal infrastructure to be completed by June 30, 2015, and for all work invoices to be provided to MassDOT by July 31, 2015. MassDOT will reimburse cities and towns as invoices are received.

Please view the WRAP apportionment list.

Written By:

Recent Posts

MassDOT Winter Storm Advisory posted on Jan 16

MassDOT Winter Storm Advisory   Overnight snow, freezing rain, and heavy winds anticipated across statewide regions Motorists are advised to allow extra travel time and delay trips if possible    BOSTON – The Massachusetts Department of Transportation (MassDOT) is advising travelers that a strong fast-moving   …Continue Reading MassDOT Winter Storm Advisory

MassDOT Travel Advisory: Martin Luther King Jr. Holiday on Monday, January 17 posted on Jan 14

MassDOT Travel Advisory:  Martin Luther King Jr. Holiday on Monday, January 17 Massachusetts Registry of Motor Vehicles Service Center locations closed Boston-Quincy I-93 HOV lane opens early today at 1 p.m.; no deployment Monday On Monday, MBTA subways, buses, and The RIDE will operate on   …Continue Reading MassDOT Travel Advisory: Martin Luther King Jr. Holiday on Monday, January 17

Baker-Polito Administration Awards $2 Million in Grants to Reduce Air Pollution from Diesel Engines posted on Jan 11

Baker-Polito Administration Awards $2 Million in Grants to Reduce Air Pollution from Diesel Engines BOSTON – The Baker-Polito Administration today announced grant awards for projects that will reduce the release of harmful diesel emissions into the atmosphere from vehicles across the Commonwealth and help to   …Continue Reading Baker-Polito Administration Awards $2 Million in Grants to Reduce Air Pollution from Diesel Engines