Post Content

 MassDOT_Logo

For Immediate Release                                                                    

June 9, 2021

MassDOT Advisory: Bedford 

Temporary Daytime Closures on the Middlesex Turnpike 

Closures will occur from 4 a.m. until 3 p.m., on Thursday, June 17 and Friday, June 18

BEDFORD – The Massachusetts Department of Transportation (MassDOT) is announcing an upcoming closure for paving operations along the Middlesex Turnpike in Bedford. This work will occur daily between the hours of 4:00 a.m. and 3:00 p.m. on Thursday, June 17 and Friday, June 18.

These traffic impacts are necessary to install pavement transitions to facilitate an upcoming traffic shift to allow for the next phase of construction.  These pavement transitions will be constructed on Middlesex Turnpike between Crosby Drive and Oak Park Drive.

This project includes transportation improvements to Middlesex Turnpike in Bedford and Billerica.  The proposed roadway improvements include widening of the Turnpike from a two-lane roadway to a four-lane roadway with the addition of a raised median, protected left turn lanes, traffic signals and sidewalks. Replacement of the bridge culvert at the Shawsheen River is also included in this project.  The contract was awarded to Barletta Heavy Division with an estimated total cost of $34.5 million and completion date of June 2023.

Drivers who are traveling through the area should reduce speed and use caution.

Appropriate signage, law enforcement details, and advanced message boards will be in place to guide drivers through the work area.

For more information on traffic conditions, travelers are encouraged to:

  • Dial 511 and select a route to hear real-time conditions.
  • Visit www.mass511.com, a website that provides real-time traffic and incident advisory information and allows users to subscribe to text and email alerts for traffic conditions.
  • Follow MassDOT on Twitter @MassDOT to receive regular updates on road and traffic conditions.
  • Download MassDOT’s GoTime mobile app and view real-time traffic conditions before setting out on the road.

###

Written By:

Recent Posts

Acceler-8 I-90 Bridge Replacement Project: Cordaville Road Work Complete posted on Aug 2

Acceler-8 I-90 Bridge Replacement Project: Cordaville Road Work Complete

The Massachusetts Department of Transportation (MassDOT) is pleased to announce that the replacement of the I-90 eastbound bridge over Cordaville Road in Southborough was successfully completed ahead of schedule this morning at 2:45 a.m. All lanes on I-90 and Cordaville Road are now open for travel.

Guest Blog: MassDOT, MAPFRE Insurance Reminder: July is Vehicle Theft Prevention Month posted on Jul 29

Guest Blog: MassDOT, MAPFRE Insurance Reminder: July is Vehicle Theft Prevention Month

The summer of 2021 is bringing more family and friend gatherings as more vaccines are distributed across the state. Unfortunately, with the lifting of COVID-19 restrictions, the nation is seeing an increase in crime, including vehicle theft. Vehicle thefts are at a 10-year high, up nearly 10% in the country, and higher in some metropolitan areas, according to the National Insurance Crime Bureau.

Governor Charlie Baker Announces Appointment of Jamey Tesler as Transportation Secretary posted on Jul 28

Governor Charlie Baker Announces Appointment of Jamey Tesler as Transportation Secretary

Governor Charlie Baker and Lt. Governor Karyn Polito today announced the appointment of Jamey L. Tesler as Secretary of Transportation and CEO of the Massachusetts Department of Transportation (MassDOT). Tesler has served as Acting Secretary since January, when he was appointed to replace former Secretary Stephanie Pollack after Pollack’s appointment as Deputy Administrator of the Federal Highway Administration for the Biden-Harris Administration.