Post Content

MassDOT Draft STIP 2017-21 CoverMassDOT announces the release of the draft State Transportation Improvement Program (STIP) for Federal Fiscal Years (FFY) 2017-2021 and welcomes public comment until August 9, 2016.

The STIP is a five-year investment program that prioritizes federal and non-federal funds for improvements to our roadways, bridges, transit systems, and bicycle and pedestrian facilities throughout the Commonwealth. MassDOT and our regional Metropolitan Planning Organization (MPO) partners collaborated to develop the draft STIP. The STIP reflects the regional transportation priorities found in the thirteen regional Transportation Improvement Programs (TIPs) developed through metropolitan planning processes.

Each of the MPOs referenced their respective Public Participation Plans to facilitate and guide participation at the regional level ensuring an inclusive public process. During the development of the thirteen regional TIPs, MPOs held numerous public meetings across the Commonwealth to solicit comments from members of the public, elected officials, and other stakeholders. Recommendations concerning proposed transportation investments were in part prioritized by utilizing regionally adopted Transportation Evaluation Criteria to score projects. After evaluation of potential projects, the MPOs voted on the investments to prioritize in their respective TIP.

The draft STIP is available for review. Comments on the draft STIP can be mailed to STIP Coordinator, MassDOT, Office of Transportation Planning, 10 Park Plaza Room 4150, Boston MA 02116, by fax to 857-368-0639, by e-mail to planning@dot.state.ma.us or using the online comment tool.

If you need a reasonable accommodation such as language translations or an alternative accessible format to fully participate in the comment process, please contact the MassDOT Title VI Strategies Specialist at (857) 368-8882.

Written By:

Tags: , ,

Recent Posts

Final Statewide Exit Renumbering Work on I-290 and I-395 posted on Aug 5

Final Statewide Exit Renumbering Work on I-290 and I-395

The Massachusetts Department of Transportation (MassDOT) is announcing that it will begin installation of the new milepost-based signs at all exits along Interstate 290 and Interstate 395, between Marlborough and Webster, on Sunday, August 8, 2021. This is the final corridor to be completed under the Statewide Exit Renumbering Project. The sign installation operations, which will take place nightly during overnight hours from 8:00 p.m. to 5:00 a.m. the following day, are anticipated to be completed in approximately 2 weeks.

Acceler-8 I-90 Bridge Replacement Project: Cordaville Road Work Complete posted on Aug 2

Acceler-8 I-90 Bridge Replacement Project: Cordaville Road Work Complete

The Massachusetts Department of Transportation (MassDOT) is pleased to announce that the replacement of the I-90 eastbound bridge over Cordaville Road in Southborough was successfully completed ahead of schedule this morning at 2:45 a.m. All lanes on I-90 and Cordaville Road are now open for travel.

Guest Blog: MassDOT, MAPFRE Insurance Reminder: July is Vehicle Theft Prevention Month posted on Jul 29

Guest Blog: MassDOT, MAPFRE Insurance Reminder: July is Vehicle Theft Prevention Month

The summer of 2021 is bringing more family and friend gatherings as more vaccines are distributed across the state. Unfortunately, with the lifting of COVID-19 restrictions, the nation is seeing an increase in crime, including vehicle theft. Vehicle thefts are at a 10-year high, up nearly 10% in the country, and higher in some metropolitan areas, according to the National Insurance Crime Bureau.