Post Content

33368260251_5c6a9b929c_mGovernor Charlie Baker today joined MBTA Acting General Manager Brian Shortsleeve, and Local 103 Union Representative Lou Antonellis as he presented MBTA Wirepersons Kevin O’Brien, Edward Reynolds, Richard Ryan and MBTA Green Line Inspector Stephen Nadolna with citations for their roles in helping to save a man’s life in Government Center Station.

“These individuals went above and beyond the call of duty when they utilized quick-thinking and safety skills training to respond and successfully save a man’s life,” said Governor Charlie Baker. “We are honored to recognize the valiant efforts of these dedicated public servants.”

Written By:

Tags:

Recent Posts

MassDOT Announces 2021 Transportation Innovation Conference posted on May 6

MassDOT Announces 2021 Transportation Innovation Conference

The Massachusetts Department of Transportation (MassDOT) is announcing that the Transportation Innovation Conference is scheduled to be held virtually this month, on Tuesday, May 25, Wednesday, May 26 and Thursday, May 27. The purpose of the conference is to showcase the latest technologies and equipment and to convene transportation officials, advocates, members of the private sector, and municipal officials to discuss trends in the industry, government-involved programs and initiatives.

Sumner Tunnel Swing Lane Returning to Pre-COVID Operations posted on May 5

Sumner Tunnel Swing Lane Returning to Pre-COVID Operations

The Massachusetts Department of Transportation (MassDOT) is announcing that the Sumner Tunnel “swing lane” will return to a pre-COVID operation schedule on Monday, May 10, 2021. The swing lane will be activated weekdays, Monday through Friday, from 5:00 a.m. to 10:00 a.m., and will have scheduled adjusted openings on holidays and special events, as needed. This lane is utilized to accommodate returning traffic volumes on Route 1A.

Statewide Exit Renumbering Work Update posted on May 5

Statewide Exit Renumbering Work Update

The Massachusetts Department of Transportation (MassDOT) is announcing the status of new milepost-based signs at various locations on Interstate 93 northbound and southbound between Boston and Methuen. The sign installation operations are continuing nightly during overnight hours from 8:00 p.m. to 5:00 a.m. the following morning. The work is expected to be completed in approximately four weeks.